Seletar West Road 3 · Sengkang West · B2 industrial· 33-year JTC lease
Sengkang West B2 Industrial logo
Sengkang West B2 Industrial (Sengkang Connection), artist's impression: the 10-storey B2 industrial building at golden hour seen across the landscaped road frontageArtist’s impression
Sengkang West B2 Industrial (Sengkang Connection), artist's impression: the 10-storey B2 industrial building at blue hour, every floor lit, seen across the landscaped road frontageArtist’s impression
Sengkang West B2 Industrial (Sengkang Connection), artist's impression: the glazed two-level ground frontage with commercial space and the canteen behind a bronze-columned walkway at golden hourArtist’s impression
Sengkang West B2 Industrial (Sengkang Connection), artist's impression: the entrance at the foot of the glass corner atrium at duskArtist’s impression
Sengkang West B2 Industrial (Sengkang Connection), artist's impression: the landscaped walkway along the building frontage at golden hourArtist’s impression
Sengkang West B2 Industrial (Sengkang Connection), artist's impression: the loading bays and truck apron along the long side of the building at golden hourArtist’s impression
Seletar West Road 3 · Business 2 · Soilbuild

Sengkang West B2 Industrial (Updated 2026)

Sengkang Connection

Ten storeys of Business 2 general industrial space at Seletar West Road 3, rising on a JTC site awarded to Soilbuild Group Holdings in October 2025. Also known as Sengkang Connection: 360 strata units near Seletar Aerospace Park, about 1.0 km away in a straight line, on a 33-year lease.

Latest update · November 2026

What’s New at Sengkang West B2 Industrial

Works are well under way at Seletar West Road 3. Aerial footage from November 2026 shows the basement excavation open across the site, piling rigs at work and the hoarding in place along the road frontage of Sengkang West B2 Industrial.

The development, also known as Sengkang Connection, rises as a ten-storey Business 2 building of 360 strata units, with construction scheduled for completion by the first quarter of 2029.

Soilbuild lists the project on its own website as Sengkang West, and registration with the Sales Concierge is open, so the e-brochure, floor plans and price list reach you the day each is issued.

See the full project particulars

The road to Sengkang West B2 Industrial

  1. 24 June 2025. JTC launches the Sengkang West site under the Industrial Government Land Sales programme.
  2. 19 August 2025. The tender closes with four bids.
  3. 1 October 2025. JTC awards the site to Soilbuild Group Holdings Ltd.
  4. November 2026. Basement works and piling under way on site.
  5. Ahead of the preview. The e-brochure, floor plans and price list go to registered parties as Soilbuild releases them.
  6. First quarter of 2029. Scheduled completion of construction.
At a glance

Sengkang West B2 Industrial at a Glance

Sengkang West B2 Industrial is Soilbuild Group Holdings’ new general industrial address in the Sengkang West industrial area, known too by its alternative name, Sengkang Connection. The building is planned as a ten-storey multi-user general industry factory with 360 units in total.

The land came through JTC’s Industrial Government Land Sales programme. It measures 23,196.6 square metres, carries Business 2 zoning at a gross plot ratio of 2.5, and is held on a 33-year lease. JTC caps the building height at 56 metres above the Singapore Height Datum and allows strata subdivision, which is what lets the units be sold individually.

Soilbuild’s own website lists the project under the name Sengkang West at Seletar West Road 3 and files it under the heading Mixed Development & Others.

Construction is scheduled for completion by the first quarter of 2029, well inside the 84-month project completion period set in JTC’s tender.

NameSengkang West B2 Industrial (Sengkang Connection)
AddressSeletar West Road 3, Sengkang West
DeveloperSoilbuild Group Holdings Ltd
ZoningBusiness 2 (B2)
Tenure33-year lease from JTC
Site area23,196.6 sqm
Building10 storeys, 360 units
CompletionScheduled by Q1 2029
360strata units
10storeys
33year JTC lease
2.5gross plot ratio
Why this address

Six Reasons Businesses Look at Sengkang West B2 Industrial

The case for Sengkang West B2 Industrial, also called Sengkang Connection, rests on facts set by JTC, URA and the developer. Each of the six below is drawn from those sources and explained further down the page.

1

Business 2 zoning

General and special industry belongs in B2 under URA’s guidelines, so the building is planned for working industrial firms, not only clean and light uses.

2

Strata ownership

JTC allows strata subdivision on the site, so each of the 360 units in total can be owned by a different business and bought or sold on its own.

3

A 33-year JTC lease

The term includes three years added under JTC’s enhanced industrial land lease framework for greenfield sites.

4

Near an aerospace cluster

Seletar Aerospace Park, 320 hectares and home to more than 60 multinational companies and local aerospace enterprises, lies to the north.

5

Three expressways close by

The TPE, SLE and CTE meet near Yio Chu Kang, with the Seletar Link Flyover adding a route to the TPE since 2024.

6

A builder-developer

Soilbuild builds, develops and manages business space, and has worked with JTC under its Developer Partnerships Programme.

Together they describe a building planned for industrial firms that want to own their premises in an established Business 2 estate of the North-East, close to a growing employment region and the expressway network.

Seletar West · Sengkang West · North-East

Sengkang West B2 Industrial Location

Sengkang West B2 Industrial (Sengkang Connection), artist's impression: the glass corner atrium with its bronze fins and warm-lit lift lobbies at golden hour
Artist’s impression.

Sengkang West B2 Industrial sits at Seletar West Road 3, in the band of Business 2 land that runs between the Sengkang and Fernvale housing estates and the runway of Seletar Airport. It is a working industrial setting with the North-East Region’s largest towns on one side and one of Singapore’s most specialised industrial parks on the other.

Between Seletar Aerospace Park and the Sengkang towns

Seletar Aerospace Park, which JTC began developing in 2008, spreads across 320 hectares to the north. Its nearest JTC aeroSpace block is roughly 1.4 km from Seletar West Road 3 as the crow flies (OneMap), with the airport’s passenger terminal near 2.2 km.

To the east and south, Fernvale and Sengkang supply the workforce and the daily services that an industrial address depends on. The Seletar Mall, on the Fernvale side, is about a kilometre from the site.

A B2 neighbourhood by design

The URA Master Plan shows the parcels around Seletar West Road 3 in the same Business 2 colour, most at a gross plot ratio of 2.5. Neighbours here are workshops, factories and logistics users, so a general industrial operation sits among businesses of its own kind.

That matters for B2 users in particular. General and special industries belong in B2 zones under URA planning, and because NEA keeps a 100-metre buffer around them, such land is planned in consolidated estates like this one.

Roads to the north, the east and the city

The Tampines Expressway and the Seletar Expressway meet the Central Expressway at Yio Chu Kang, close to the Seletar industrial area. The SLE runs west to the Bukit Timah Expressway at Kranji for Woodlands and the Causeway, the CTE heads south to the city, and the TPE runs east to the Pan-Island Expressway near Changi.

Since January 2024, the Seletar Link Flyover has added a direct connection between Seletar Link and the TPE in both directions, opening another route between the Seletar area, Punggol and the expressway network.

Rail for the people who work here

Two stations on the Sengkang LRT West Loop are within about a kilometre in a straight line: Thanggam (SW4) at about 0.9 kilometres and Fernvale (SW5) at about 1.0 kilometre. The loop feeds Sengkang MRT station (NE16) on the North East Line, about 3.1 kilometres from the site, for journeys towards Serangoon, Dhoby Ghaut and HarbourFront.

The aerospace community next door

JTC and EDB describe Seletar Aerospace Park as home to more than 60 multinational companies and local aerospace enterprises, with a community of about 6,000 professionals. Names such as Rolls-Royce, Pratt & Whitney, Airbus and Bombardier operate there alongside home-grown firms, and their supply chains reach into general industrial work of the kind B2 space is planned for.

JTC continues to add facilities in the park, with JTC aeroSpace Four planned as its first standard factory with green infrastructure, so the cluster on the far side of Seletar West Road 3 keeps growing.

Towns that supply people and services

Fernvale and Sengkang are among the largest housing estates of the North-East. Sengkang General Hospital is about 2.8 kilometres away in a straight line, and the Sengkang town centre, with its MRT and bus interchanges at Sengkang Square, about 3.1 kilometres, putting staff, clinics, banks and daily services within a short journey of the site.

Green space and the river

The URA Master Plan extract around the site shows a green strip along the waterway to the east, separating the industrial parcels from the housing beyond and carrying the park connector, so the estate keeps a planned edge towards Fernvale.

A region planned for more jobs

URA’s Master Plan names Punggol Digital District, Sengkang West and Seletar among the places that will bring more jobs closer to homes in the North-East. Punggol Digital District, master planned by JTC, is planned for about 28,000 jobs around the Singapore Institute of Technology’s Punggol Campus.

The location page sets out every distance in full, and the amenities page covers food, retail and healthcare in the surrounding towns.

Soilbuild Group Holdings

Sengkang West B2 Industrial Developer

Sengkang West B2 Industrial (Sengkang Connection), artist's impression: a wide view of the bright industrial canteen on the first storey
Artist’s impression.

Sengkang West B2 Industrial is a Soilbuild Group Holdings Ltd development. The integrated Singapore group has been building and developing property for over 48 years. Soilbuild builds, develops and manages, so the same group that plans a building often constructs it and runs its business space afterwards.

A long partnership with JTC

Soilbuild has delivered purpose-built business space for multinational companies and SMEs across many sectors, and has worked with JTC Corporation under JTC’s Developer Partnerships Programme, using design, build and lease or sell arrangements.

The Sengkang West site continues that relationship. Four bids came in for the JTC tender, and on 1 October 2025 the award went to Soilbuild Group Holdings Ltd. The group’s website now shows the project as Sengkang West, at Seletar West Road 3.

Business space developed for sale

Soilbuild names twelve business space developments it has built for sale. The Bizhub family alone covers Northview, North Spring, Woodlands, North Point and West Point; the others are Solstice Business Center, REVV, Liner, West Spring, Mandai Connection, Pioneer Lot and Tuas Lot.

Its business space portfolio for lease includes Solaris @ one-north, Eightrium @ Changi Business Park, West Park BizCentral, Tuas Connection, Tai Seng Exchange, Solaris @ Kallang 164, Kranji Linc and B-Central on Bendemeer Road, and the group manages more than five million square feet of business space for lease.

Recognised design

Solaris @ one-north is the group’s best-known building. Soilbuild lists among its awards a 2012 RIBA International Award, a 2016 FIABCI World Gold award for sustainable development, an SIA-NParks Skyrise Greenery first prize and a 2010 Chicago Athenaeum Green Good Design award.

Construction within the group

Soilbuild Construction Group Ltd, listed on the Singapore Exchange since 2013, provides design-and-build, turnkey and project management services. The construction of the development is scheduled for completion by the first quarter of 2029.

A steady record in JTC land sales

Industrial Government Land Sales have been a regular source of Soilbuild’s sites. JTC’s own announcements record awards to Soilbuild Group Holdings at Corporation Drive in October 2018, Tampines North Drive 4 in November 2023, Lok Yang Way in November 2024 and Jalan Buroh in July 2026, besides Sengkang West in October 2025.

Each of those sites was won by tender against other bidders, and each carries the same discipline as Seletar West Road 3: JTC’s zoning, plot ratio and completion period, set before the first drawing is made.

Teams that stay with the building

Soilbuild keeps lease management, asset management and fund management teams within the group. That continuity, from design and construction through to the running of business space, is the integrated platform the group offers to private and public companies alike.

The group also has a presence in Vietnam and Myanmar, extending its industrial experience beyond Singapore.

Connection names in the portfolio

The Connection name already runs through Soilbuild’s business space: Mandai Connection appears among its developments built for sale, and Tuas Connection among the space it holds for lease. Sengkang Connection, the alternative name of this development, sits naturally beside them.

Financing green buildings

Soilbuild’s own newsroom records a maiden green loan for its Tai Seng project in September 2019, an early step in the group’s attention to sustainable business space, which its Solaris buildings had already shown in their awards for skyrise greenery and green design.

For a buyer, that history means a developer used to building for industrial users, to JTC’s standards and to the long view of owners who keep their buildings.

Homes as well as workplaces

Beyond business space, Soilbuild has developed homes from luxury condominiums to townhouses and conservation terraces, including Villa Martia, Mutiara Crest, Grosvenor View, Pinnacle 16, One Tree Hill Residence, Leonie Parc View, Fernhill Cottage, Heritage 9 and Meier Suites, with The Mezzo and Montebleu among its award-winning projects.

Soilbuild Business Space REIT was listed on the Singapore Exchange in August 2013. The developer page gathers the group’s record in one place.

By appointment · Sales Concierge

Sengkang West B2 Industrial Showflat Appointment

Sengkang West B2 Industrial (Sengkang Connection), artist's impression: the double-height lift lobby with stone walls and bronze lift portals
Artist’s impression.

Viewings of Sengkang West B2 Industrial are held for registered parties. Showflat viewings are arranged by appointment through the Sales Concierge. Each appointment is a private session, set around your business and the questions that matter to it.

Registered parties first

Preview invitations go to registered parties ahead of the public release. Sign up with the form here, or call or WhatsApp +65 6200 6220, and the Sales Concierge keeps a viewing slot in your name for the opening days.

Soilbuild’s brochure, plans and price list reach registrants on their release days, which leaves the viewing free for choosing a unit rather than first impressions.

What an appointment covers

The session walks through the building as Soilbuild presents it: the ten-storey block of 360 units, the unit layouts and sizes on release, and the specifications that shape how a business will use its space.

It also covers the B2 permitted uses under the Master Plan, so you can match your operation to the zoning before committing, and the way JTC’s conditions for the site apply to the people who buy and occupy its units.

Your numbers, side by side

Industrial purchases follow their own rules. GST at 9% is charged on each instalment of a building under construction, Buyer’s Stamp Duty runs on the non-residential scale up to 5%, and CPF savings cannot be used, so the purchase is funded by cash and a bank loan.

Bring your figures or work them out beforehand with the industrial purchase calculator and the stamp duty calculator. The payment scheme page lays out how the progressive payments follow construction.

The first eight weeks, step by step

Once a unit is chosen, the option to purchase is taken up with a 5% option fee plus GST. The sale and purchase agreement follows in about two weeks and is exercised within three weeks of receipt, when stamp duty and legal fees are paid; about three weeks later the balance of 15% is paid with GST.

Stamp duty falls due within 14 days of exercising the option or signing the agreement, so it helps to have funds ready before the appointment. The payment scheme page sets out each step and the instalments that follow.

After the purchase

Instalments then follow the works on site, with 25% at the Temporary Occupation Permit and 10% on completion. A resale inside the first three years attracts Seller’s Stamp Duty, and from TOP the owner pays property tax at 10% of the Annual Value set by IRAS.

Company or individual purchase

Industrial property is open to individuals, Singapore-incorporated companies and foreign entities, and no Additional Buyer’s Stamp Duty applies. Many banks prefer to lend to a company for a B2 unit, so it helps to settle the buying entity early; the industrial loan page explains why.

Documents on the table

Registered parties go into their viewing already holding every document Soilbuild has released: e-brochure, floor plans and price list. The appointment brings them together with the site plan and the sale documents, so unit choice, use and financing can be settled in one sitting.

GST recovery and your buying entity

Whether GST on the purchase can be recovered depends on the buyer. As a guideline, a GST-registered company already making taxable supplies may claim it as input tax as it is incurred, while a newly formed or investment-holding company would not usually claim during construction, and may begin once the building reaches TOP and taxable activity starts. In every case this is subject to the rules set by IRAS, and the stamp duty and GST page explains the distinction.

Arranging your appointment

Tell the Sales Concierge how you intend to use the unit and the timing that suits you. The appointment is confirmed by phone or email, and the documents released by then are ready for you to take away.

On the map

Sengkang West B2 Industrial Location

Seletar West Road 3

Address: Sengkang West B2 Industrial (Sengkang Connection), Seletar West Road 3, Sengkang West, Singapore

Nearest rail: Thanggam LRT station (SW4) on the Sengkang LRT West Loop, about 0.9 km in a straight line; Sengkang MRT (NE16) on the North East Line is about 3.1 km.

Thanggam LRT (SW4)about 0.9 km
Fernvale LRT (SW5)about 1.0 km
The Seletar Mallabout 1.0 km
JTC aeroSpace, Seletar Aerospace Parkabout 1.4 km
Seletar Airport passenger terminalabout 2.2 km

Straight-line distances measured on OneMap from the site.

Industrial Government Land Sales

The JTC Tender Behind Sengkang West B2 Industrial

The land for Sengkang West B2 Industrial was released by JTC Corporation under the Industrial Government Land Sales programme, the channel through which the Government sells industrial land to the market. JTC launched the Sengkang West site on 24 June 2025 as the last of seven Confirmed List sites for the first half of the 2025 programme.

The tender closed on 19 August 2025 with four bids. On 1 October 2025 JTC awarded the site to Soilbuild Group Holdings Ltd at a tendered sum of $156,114,008.

What the tender conditions fix

JTC’s particulars set the planning envelope that every later design decision works within: Business 2 zoning, a gross plot ratio of 2.5 on 23,196.6 square metres of land, and a maximum building height of 56 metres above the Singapore Height Datum.

They also allow strata subdivision. That single condition is what makes a multi-user development possible here, with 360 units in total that can each be owned by a different business.

A deadline written into the land

The tender carries a project completion period of 84 months. Soilbuild expects to finish construction in the first quarter of 2029, well inside that window.

An extra three years of lease

JTC launched the site with an additional three years of lease tenure under the enhancements to the industrial land lease framework, which is how the lease stands at 33 years.

LocationSengkang West (Seletar West Road 3)
Planning areaSengkang, North-East Region
Programme1H 2025 IGLS, Confirmed List
ZoningBusiness 2
Site area23,196.6 sqm
Tenure33 years (30 plus 3 under the enhanced lease framework)
Gross plot ratio2.5
Maximum building height56 m SHD
Strata subdivisionAllowed
Project completion period84 months
Tender launched24 June 2025
Tender closed19 August 2025, four bids
Awarded1 October 2025, Soilbuild Group Holdings Ltd
Tendered sum$156,114,008

Source: JTC Corporation, launch and award announcements for the Sengkang West site and its land sales listing.

Business 2 zoning

What B2 Zoning Means at Sengkang West B2 Industrial

Artist's impression, illustrative only: a wide view of an empty, light-filled B2 factory unit
Artist’s impression, illustrative only.

Business 2 is the zoning for general and special industry in the URA Master Plan. URA’s development control guidelines state that clean and light industries may be allowed in Business 1 zones, while general and special industries are to be located in Business 2 zones, depending on the nature of their activities.

The difference is felt at the boundary. NEA requires a 50-metre nuisance buffer from a B1 zone to the surrounding area and a 100-metre buffer from a B2 zone, and the types of industry with their buffer requirements are listed in NEA’s Code of Practice for Pollution Control.

Uses URA lists for Business 2

URA’s allowable-uses guidelines for Business 2 name manufacturing (general industry), repair and servicing, production, assembly, the storage of chemicals and oils, knitting mills, core media, certain e-business activities and industrial training.

At Sengkang West B2 Industrial, JTC’s tender conditions add that the development is for uses the competent authority may permit under Business 2 zoning in line with the Master Plan Written Statement, and subject to the approval of JTC and the relevant authorities, with prohibited uses specified in the conditions.

Matching an operation to the space

Because B2 approval turns on the activity itself, the intended use of each unit is the first thing to settle. The Sales Concierge can set out the permitted uses for the development as Soilbuild releases them, so a business can see how its operation fits before it commits.

ZoningBusiness 2 (B2)
NEA nuisance buffer100 m from a B2 zone
For comparison50 m from a B1 zone
Typical B2 usesManufacturing, repair and servicing, production, assembly
Also listed by URAStorage of chemicals and oils, core media, industrial training
Site approvalsJTC and the relevant competent authorities

Sources: URA development control guidelines for Business 1 and Business 2; JTC land sales listing for Sengkang West.

Lease and approvals

The 33-Year Lease at Sengkang West B2 Industrial

Sengkang West B2 Industrial (Sengkang Connection), artist's impression: the bright industrial canteen on the first storey
Artist’s impression.

Industrial Government Land Sales sites are sold on fixed leases from JTC. The Sengkang West site, on which Sengkang West B2 Industrial stands, carries a 33-year lease, which includes the additional three years JTC introduced for greenfield sites under its enhanced industrial land lease framework.

JTC has described the added three years as giving developers greater flexibility in delivering industrial space that serves the full lease term. In practice, construction takes part of every industrial lease, so the extension lengthens the period the finished building is in use.

JTC and the uses in the building

The tender conditions make the development subject to the approval of JTC and all the relevant competent authorities, and they list prohibited uses. Each unit’s use is therefore checked against the B2 framework and JTC’s conditions, and the approval process for buyers and occupiers is set out in the sale documents Soilbuild issues.

What the lease means for financing

Banks set the tenure of an industrial loan against the lease that remains, so the length of the lease is part of every financing conversation. The industrial loan page explains how lenders approach B2 units, and why many prefer to lend to a company.

Tenure33-year lease from JTC
Basis30 years plus 3 years under the enhanced lease framework
ApprovalsJTC and the relevant competent authorities
UseAs permitted for Business 2 zoning

Source: JTC Corporation, launch announcement for the Sengkang West site and its tender particulars.

Seletar Aerospace Park · Seletar Airport

Seletar Aerospace Park Near Sengkang West B2 Industrial

Seletar Aerospace Park is the closest major employment cluster to Sengkang West B2 Industrial. The Government began developing the park in 2008, and JTC has grown it into a 320-hectare cluster planned around the needs of aerospace companies, beside Seletar Airport.

Since 2008

A purpose-built cluster

JTC master-planned the park so aerospace companies could share infrastructure and supply chains, with maintenance, repair and overhaul, manufacturing, design, training and business aviation side by side.

About 1.0 km

Close by in a straight line

In a straight line on OneMap, the park’s nearest road is about 1.0 km from the site, its nearest JTC aeroSpace block about 1.4 km and the Seletar Airport passenger terminal about 2.2 km.

320 hectares

Room to grow

JTC continues to add ready-built facilities in the park, including JTC aeroSpace Four, planned as the first standard factory there with green infrastructure, adding to the factory space available to aerospace firms.

Seletar Airport itself handles business and general aviation, and the park around it hosts aircraft maintenance, engine work, component repair and training, the activities JTC planned the cluster to bring together.

The park’s operators rely on precision engineering, component supply, logistics and repair services, much of which sits within Business 2 use. For a general industrial firm at Seletar West Road 3, that means customers and suppliers a short drive away rather than across the island.

The location page sets the park beside the other employment nodes around the site.

Sengkang West · Seletar · Punggol

The Industrial Cluster Around Sengkang West B2 Industrial

The land around Seletar West Road 3 forms a consolidated Business 2 estate: the URA Master Plan shows the neighbouring parcels in the same zoning, largely at the same plot ratio of 2.5. Sengkang West B2 Industrial adds ten storeys of strata space to that estate.

Sengkang West in the Master Plan

URA’s plans for the North-East Region describe how Punggol Digital District, Sengkang West and Seletar will offer residents more job choices near their homes. The aim is a region where people can live, work and play without long cross-island commutes.

Punggol Digital District

Master planned and developed by JTC, Punggol Digital District combines JTC business park space with the Singapore Institute of Technology’s Punggol Campus, which officially opened on 16 September 2025. At 50 hectares it is the largest mixed-use Green Mark Platinum District in Singapore, and it is planned to bring 28,000 jobs closer to homes.

The district is anchored by Punggol Coast MRT station on the North East Line, about 5.2 kilometres from the site in a straight line.

A new industrial park at Seletar East

The Draft Master Plan 2025 also plans a new industrial park at Seletar East to support the semiconductor industry, extending the cluster of advanced industry across the Seletar area.

Planned with Sengkang WestPunggol Digital District, Seletar
Punggol Digital District50 ha, about 28,000 jobs planned
SIT Punggol CampusOfficially opened 16 September 2025
Seletar EastNew industrial park for semiconductors

Sources: URA Master Plan 2025, North-East Region; JTC Corporation.

Expressway network

Road Links From Sengkang West B2 Industrial

For an industrial business, the road network is the location. Sengkang West B2 Industrial is close to the point where three expressways meet, so deliveries and staff have direct routes to the north, the east and the city.

RouteWhat it connects
Seletar Expressway (SLE)Links the TPE and CTE junction at Yio Chu Kang with the Bukit Timah Expressway at Kranji, for Woodlands and the Causeway
Tampines Expressway (TPE)Runs from the SLE and CTE junction east to the Pan-Island Expressway near Changi
Central Expressway (CTE)Runs south from Yio Chu Kang through Ang Mo Kio and Toa Payoh to the city
Kallang-Paya Lebar Expressway (KPE)Links the TPE with the East Coast Parkway, largely in tunnel
Seletar Link FlyoverOpened 22 January 2024, connecting Seletar Link and the TPE in both directions

Expressway descriptions follow the Land Transport Authority.

Distances that matter for logistics

Measured in a straight line on OneMap, Woodlands Checkpoint, the land crossing to Johor, is about 12.3 kilometres from the site, and Changi Airport’s Terminal 1 bus terminal about 14.2 kilometres. Seletar Airport’s passenger terminal, for business aviation and regional flights, is about 2.2 kilometres away.

LTA’s Seletar Link Flyover, opened in January 2024, gives motorists another route between Punggol, the Seletar area and the TPE towards the CTE and SLE, as well as towards the KPE and the PIE.

LRT · MRT

Rail Stations Near Sengkang West B2 Industrial

The Sengkang LRT West Loop runs through Fernvale, just east of the industrial area. Four of its stations lie within about 1.5 kilometres of Sengkang West B2 Industrial in a straight line, and the loop connects with the North East Line at Sengkang station.

StationLineFrom the site
Thanggam (SW4)Sengkang LRT West Loopabout 0.9 km
Fernvale (SW5)Sengkang LRT West Loopabout 1.0 km
Layar (SW6)Sengkang LRT West Loopabout 1.4 km
Kupang (SW3)Sengkang LRT West Loopabout 1.5 km
Sengkang (NE16)North East Line, LRT interchangeabout 3.1 km

Straight-line distances measured on OneMap from the site.

From Sengkang station the North East Line runs south through Serangoon, where it meets the Circle Line, to Dhoby Ghaut and HarbourFront, and north to Punggol and Punggol Coast for Punggol Digital District.

URA Master Plan 2025

Sengkang West B2 Industrial in the URA Master Plan

URA unveiled the Draft Master Plan 2025 on 25 June 2025, Singapore’s land use blueprint for the next 10 to 15 years, shaped by the participation of almost 220,000 people. Its regional plans set out where homes, jobs and green space will grow.

For the North-East Region, URA names Punggol Digital District, Sengkang West and Seletar as the developments that will offer residents more job choices near their homes, describing a future-ready region for living, working and playing. Sengkang West B2 Industrial is part of that Sengkang West story.

Jobs closer to home

The Master Plan’s decentralisation strategy brings work out of the city centre and into the regions. In the North-East, that means business park and campus space at Punggol, aerospace at Seletar, and industrial estates such as the one at Seletar West Road 3.

Advanced industry at Seletar

The same plan proposes a new industrial park at Seletar East to support the semiconductor industry, adding another node of advanced manufacturing to the Seletar area.

Draft Master Plan 2025Unveiled 25 June 2025
North-East job nodesPunggol Digital District, Sengkang West, Seletar
Seletar EastNew industrial park for semiconductors
Site zoningBusiness 2, gross plot ratio 2.5

Source: Urban Redevelopment Authority, Master Plan 2025, North-East Region.

Actual site · November 2026

Sengkang West B2 Industrial Site Progress

These photographs are stills from aerial footage of the site at Seletar West Road 3, taken in November 2026. They show Sengkang West B2 Industrial as it is today, a construction site, and are labelled as actual site photos.

Sengkang West B2 Industrial (Sengkang Connection), actual site photo: aerial view of the Seletar West Road 3 site under construction, with the excavated basement area, the site hoarding along the road and green open land beside it, November 2026.Actual site, under construction
November 2026

The whole site

Basement works open across the site, with piling rigs in place and the hoarding along the road.

Sengkang West B2 Industrial (Sengkang Connection), actual site photo: an aerial approach over the Seletar West industrial area towards the site, November 2026.Actual site, under construction
November 2026

The approach

The view from the north-east, over neighbouring industrial land towards the site and the towns beyond.

Sengkang West B2 Industrial (Sengkang Connection), actual site photo: a closer aerial view of the basement works and piling rigs on site, November 2026.Actual site, under construction
November 2026

Basement works

A closer view of the excavation and the rigs working on the foundations.

Soilbuild expects to finish construction in the first quarter of 2029. The project details page keeps these site photos with the month each shows, and registered parties hear of each milestone as it is reached.

Financing at a glance

Buying a Unit at Sengkang West B2 Industrial

Stamp duty

Non-residential scale

IRAS charges Buyer’s Stamp Duty from 1% to 5% across five bands, with no Additional Buyer’s Stamp Duty on industrial property. Stamp duty and GST

GST

9% on each instalment

On a building under construction, GST is charged as each instalment falls due where the seller is GST-registered. Duty calculator

Payments

Paid as it is built

A 20% payment over the eight-week sale and purchase period, then instalments as each construction stage completes. Payment scheme

Loans

Cash and a bank loan

CPF cannot be used, and banks set loan limits by use, with owner-occupiers usually treated most favourably. Industrial loan

Selling within three years of buying attracts Seller’s Stamp Duty, at 15%, then 10%, then 5% as each year passes. The industrial purchase calculator brings the stamp duty, GST and payment stages for Sengkang West B2 Industrial together in one estimate; confirm figures with IRAS, MAS or your bank before any commitment.

Priority registration

Register for Sengkang West B2 Industrial

Sengkang West B2 Industrial, also known as Sengkang Connection, brings 360 strata units in a ten-storey B2 building to Seletar West Road 3. Registered parties receive each release from the developer as it is issued, with first choice of viewing appointments.

Sent to registered parties first

The Sales Concierge
ViewingsShowflat viewings are arranged by appointment through the Sales Concierge.
AddressSeletar West Road 3, Sengkang West
ZoningBusiness 2 (B2)
Tenure33-year JTC lease
Scale10 storeys, 360 units
DeveloperSoilbuild Group Holdings

Register for Sengkang West B2 Industrial

Each registration is answered personally by the Sales Concierge.

Prefer a call? Phone or WhatsApp the Sales Concierge on +65 6200 6220.

Sengkang West B2 Industrial FAQ

Sengkang West B2 Industrial Frequently Asked Questions

What is Sengkang West B2 Industrial?

Sengkang West B2 Industrial, also known as Sengkang Connection, is a ten-storey Business 2 general industrial development of 360 strata units at Seletar West Road 3, developed by Soilbuild Group Holdings Ltd on a site JTC awarded on 1 October 2025.

Is Sengkang Connection the same development as Sengkang West B2 Industrial?

Yes. Sengkang Connection is the alternative name of Sengkang West B2 Industrial. Both names refer to the same Soilbuild development at Seletar West Road 3.

Who is the developer of Sengkang West B2 Industrial?

The developer is Soilbuild Group Holdings Ltd, the Singapore integrated property group that builds, develops and manages business space. Soilbuild lists the project on its own website as Sengkang West, at Seletar West Road 3.

What is the tenure of Sengkang West B2 Industrial?

The land is held on a 33-year lease from JTC. JTC launched the Sengkang West site with an additional three years of lease tenure under the enhanced industrial land lease framework.

What zoning does Sengkang West B2 Industrial have?

The site is zoned Business 2 (B2), the URA zone for general and special industries. NEA keeps a 100-metre buffer between such zones and the homes around them.

How many units does Sengkang Connection have?

The building is planned as a ten-storey multi-user general industry factory with 360 units in total. Unit sizes and the unit mix are shared with registered parties at release.

How large is the Sengkang West B2 Industrial site?

JTC gives the site area as 23,196.6 square metres, with a gross plot ratio of 2.5 and a maximum building height of 56 metres above the Singapore Height Datum.

When was the Sengkang West land tender awarded?

JTC launched the tender on 24 June 2025, closed it on 19 August 2025 with four bids, and awarded the site to Soilbuild Group Holdings Ltd on 1 October 2025 at a tendered sum of $156,114,008.

When will Sengkang West B2 Industrial be completed?

Construction is scheduled for completion by the first quarter of 2029. JTC's tender conditions set a project completion period of 84 months for the site.

Where is Sengkang West B2 Industrial?

The development is at Seletar West Road 3, in the Sengkang West industrial area of Singapore's North-East Region, south of Seletar Aerospace Park and west of the Fernvale and Sengkang housing estates.

Which train stations are near Sengkang Connection?

Measured in a straight line on OneMap from the site, Thanggam LRT station (SW4) is about 0.9 kilometres away and Fernvale LRT station (SW5) about 1.0 kilometre, both on the Sengkang LRT West Loop, which connects to the North East Line at Sengkang MRT station (NE16).

Which expressways serve Sengkang West B2 Industrial?

The Tampines Expressway and the Seletar Expressway meet the Central Expressway near Yio Chu Kang, giving the area routes to Woodlands and the Causeway, to the city, and east towards Changi; the Kallang-Paya Lebar Expressway links the TPE to the East Coast Parkway.

How far is Seletar Aerospace Park from the site?

Seletar Aerospace Park lies to the north, its nearest road about 1.0 km from the site in a straight line. Measured as the crow flies on OneMap, the nearest JTC aeroSpace block sits roughly 1.4 km away and the Seletar Airport passenger terminal roughly 2.2 km.

Can a company buy a unit at Sengkang West B2 Industrial?

Yes. Individuals, Singapore companies and foreign buyers may all purchase industrial property here, and Additional Buyer's Stamp Duty does not apply. Many banks prefer to lend for B2 units to a company rather than to an individual.

Is GST payable on a Sengkang Connection purchase?

Yes, where the seller is GST-registered, as developers normally are. The 9% GST is then billed with each progress payment while the building goes up.

Can CPF be used to buy an industrial unit?

No. CPF savings cannot be used for industrial property, so a purchase is funded by cash and a bank loan. The industrial loan page sets out how lenders approach B2 units.

What stamp duty applies to an industrial purchase?

Buyer's Stamp Duty on non-residential property rises from 1% to 5% across five bands of the price, with no Additional Buyer's Stamp Duty, and a resale inside three years attracts Seller's Stamp Duty. The stamp duty and GST page lists each band.

How do I arrange a Sengkang West B2 Industrial showflat appointment?

Showflat viewings are arranged by appointment through the Sales Concierge. Once you register by form, call or WhatsApp on +65 6200 6220, a slot is reserved in your name for the first viewing days.

How do I receive the brochure, floor plans and price list?

Use the enquiry form, call or WhatsApp +65 6200 6220, or write to sales@sengkangwestb2industrial.com.sg to register with the Sales Concierge. Each document is sent to registered parties on the day it is released.

Who can I contact about Sengkang West B2 Industrial?

The Sales Concierge answers every enquiry personally: call or WhatsApp +65 6200 6220, email sales@sengkangwestb2industrial.com.sg, or use the enquiry form on any page.

Next step

See Whether Sengkang West B2 Industrial Fits Your Business

Tell the Sales Concierge how your business will use the space, and receive each release of Sengkang West B2 Industrial, also known as Sengkang Connection, the day it is issued.

Units360 in total
Storeys10
Lease33 years from JTC
CompletionScheduled by Q1 2029