Units at Sengkang West B2 Industrial are sold during construction, which means the price falls due in steps tied to progress on site.
The Sengkang West B2 Industrial Payment Stages
| Stage | Indicative timing | Payment |
|---|---|---|
| S&P period (option and sale and purchase, combined) | About 8 weeks | 20% |
| Completion of foundation work | 6–9 months | 10% |
| Completion of reinforced concrete framework | 6–9 months | 10% |
| Completion of walls | 3–6 months | 5% |
| Completion of ceiling | 3–6 months | 5% |
| Completion of doors and windows | 3–6 months | 5% |
| Completion of electrical, sanitary and air-conditioning works | 3–6 months | 5% |
| Completion of car park, roads and drains | 3–6 months | 5% |
| Temporary Occupation Permit | 9–12 months | 25% |
| On completion | About 12 months | 10% |
The standard industrial schedule for a building under construction; 9% GST is added to each instalment. Soilbuild’s own terms come with the price list.
The first 20% is paid within the sale and purchase period before any bank loan is drawn, so it comes from the buyer’s own funds. The construction stages that follow can be met from the loan, with the GST on each paid in cash.
The First Eight Weeks at Sengkang West B2 Industrial
| When | What happens |
|---|---|
| On the option to purchase | 5% option fee, plus GST |
| About 2 weeks later | The sale and purchase agreement is issued |
| Within 3 weeks of receiving it | Exercise the agreement; stamp duty and legal fees are paid |
| About 3 weeks after that | The balance 15%, plus GST |
If the option lapses, part of the option fee is usually forfeited and the rest refunded; the option itself sets the exact terms.
How the Sengkang West B2 Industrial Schedule Differs From a Home Purchase
- The option fee and the sale and purchase payment are combined into 20%, where a home purchase splits them as 5% and 15%.
- Five 5% stages follow the framework, one more than a residential schedule.
- The last instalment, on completion, is 10% rather than 15%.
- GST is payable on every instalment; residential purchases carry none.
- CPF savings cannot be used, so the purchase is funded by cash and a bank loan.
The industrial purchase calculator sets each stage against your own price, loan and dates.
Register for Sengkang West B2 Industrial
Sengkang West B2 Industrial, also known as Sengkang Connection, brings 360 strata units in a ten-storey B2 building to Seletar West Road 3. Registered parties receive each release from the developer as it is issued, with first choice of viewing appointments.
Sent to registered parties first
- Preview dates, and a viewing appointment held for you once appointments open.
- The e-brochure, the floor plans and the price list, sent the day Soilbuild issues them.
- An estimate from the industrial purchase calculator, read beside the stamp duty and GST rules.
- Plain answers on industrial financing and the progressive payment stages.
Register for Sengkang West B2 Industrial
Each registration is answered personally by the Sales Concierge.
Prefer a call? Phone or WhatsApp the Sales Concierge on +65 6200 6220.
