Seletar West Road 3 · Sengkang West · B2 industrial· 33-year JTC lease
Sengkang West B2 Industrial logo
Sengkang West B2 Industrial (Sengkang Connection), artist's impression: the double-height lift lobby with stone walls and bronze lift portalsArtist’s impression
Financing tools

Sengkang West B2 Industrial Purchase Calculator

Use this tool to see what an industrial unit at Sengkang West B2 Industrial costs in full during construction: the cash needed in the first eight weeks, GST on every instalment, Buyer’s Stamp Duty on the non-residential scale and the repayment as the loan is drawn.

Illustrative figure, enter your own price. The calculator opens at $2,000,000 so the results show on load; that figure is unrelated to the development, whose price list is sent to registered parties on release.

Keep a copy of this estimate as a PDF.

Purchase details

Results refresh as you type.

Banks keep 90% mainly for operating companies occupying their own unit; for investment buyers, 80% is the usual ceiling.

Ask your bank for the rate after any lock-in period as well.

These two figures feed only the property tax estimate below.

The first eight weeks

Enter a booking date to see calendar dates.

    Loan summary

    Based on the loan-to-value you chose.

    Purchase price
    —
    Bank loan
    —
    Your contribution
    —

    Payment breakdown, weeks 0 to 8

    GST is added to every instalment when it is billed.

    Cash needed to secure the unit

    Cash from your own funds; bank drawdowns are left out.

    Total cash due within 8 weeksBefore construction begins
    —

    Upfront costs only. Later instalments are drawn from your loan stage by stage, while the GST on each stays a cash payment.

    Progressive payment schedule

    Stage timing is indicative and follows the progress of the building.

    Swipe sideways to see the full table

    StageTimeline% InstalmentGST 9% Your cashLoan drawnLoan % InterestPrincipalRepayment

    Monthly repayment

    Once the loan is fully drawn.

    Full monthly instalment
    —

    While the building rises, interest accrues only on the amount drawn, so repayments step up stage by stage, as the last columns of the schedule show.

    Property tax estimate

    Charged from TOP; none during construction.

    Estimated annual rent
    —
    Unit size
    —
    Annual tax at 10%
    —

    Property tax on industrial units is 10% of an Annual Value that IRAS sets from market rents. The rent and size entered here are your own assumptions.

    How the Sengkang West B2 Industrial Calculator Works

    Buyer’s Stamp Duty is worked out on the non-residential scale of 1% to 5% on the price before GST, and no Additional Buyer’s Stamp Duty is added. GST at 9% is applied to each instalment as it is billed, including the instalments your loan pays, because GST follows what is owed to the developer.

    The bank begins to disburse after the sale and purchase period, so the repayment shown for each stage is the instalment on the amount drawn so far. It rises through construction and reaches its full level at completion.

    Sengkang West B2 Industrial Loan-to-Value Choices

    Banks set industrial loan limits themselves, with no MAS cap, and owner-occupiers usually receive the highest limits. Where a facility above a stage sum is granted, the excess is drawn once the mortgage is in place; at lower loan-to-values, later stages are paid in cash, as the schedule shows.

    The industrial loan page explains how lenders assess B2 units, and the stamp duty and GST page covers GST recovery for operating and non-operating companies.

    Rates checked against IRAS and MAS on 21 November 2026. Confirm with IRAS, MAS or your bank before any commitment.

    Priority registration

    Register for Sengkang West B2 Industrial

    Sengkang West B2 Industrial, also known as Sengkang Connection, brings 360 strata units in a ten-storey B2 building to Seletar West Road 3. Registered parties receive each release from the developer as it is issued, with first choice of viewing appointments.

    Sent to registered parties first

    The Sales Concierge
    ViewingsShowflat viewings are arranged by appointment through the Sales Concierge.
    AddressSeletar West Road 3, Sengkang West
    ZoningBusiness 2 (B2)
    Tenure33-year JTC lease
    Scale10 storeys, 360 units
    DeveloperSoilbuild Group Holdings

    Register for Sengkang West B2 Industrial

    Each registration is answered personally by the Sales Concierge.

    Prefer a call? Phone or WhatsApp the Sales Concierge on +65 6200 6220.