The Short Answer on Buying at Sengkang West B2 Industrial
A purchase at Sengkang West B2 Industrial follows the standard path for an industrial unit under construction: register, attend an appointment, take up an option to purchase, complete the sale and purchase within about eight weeks, then pay in stages as the building rises. Construction is scheduled for completion by the first quarter of 2029.
Each step has fixed time limits, so knowing them in advance keeps the purchase on track.
Before the Option at Sengkang West B2 Industrial
Registered parties get the e-brochure, floor plans and price list on release day, plus a viewing slot when the showflat opens. Showflat viewings are arranged by appointment through the Sales Concierge.
It helps to settle the buying entity, the loan and the intended use before choosing a unit, since banks often prefer a company borrower for B2 space and each use is subject to the approval of JTC and the relevant authorities.
The First Eight Weeks at Sengkang West B2 Industrial
On the option to purchase, a 5% option fee is paid, with GST. The sale and purchase agreement follows in about two weeks and is exercised within three weeks of receipt, when stamp duty and legal fees are paid. About three weeks later the balance of 15% is paid, with GST, completing the 20% due in the sale and purchase period.
Stamp duty falls due within 14 days of exercising the option or signing the agreement. The payment scheme page sets out the timeline.
Payments During Construction at Sengkang West B2 Industrial
After the first 20%, instalments follow the works: 10% each at the foundation and framework stages, five stages of 5% for walls, ceiling, doors and windows, services and external works, 25% at the Temporary Occupation Permit and 10% on completion, each with 9% GST.
The bank draws the loan stage by stage, so repayments climb as the building rises.
Milestones Ahead for Sengkang West B2 Industrial
JTC awarded the site on 1 October 2025, and aerial footage from November 2026 shows the basement works and piling under way. The JTC tender sets a project completion period of 84 months, and Soilbuild expects to finish construction in the first quarter of 2029.
Registered parties hear of each milestone as it is reached; register on the contact page or through any enquiry form.
Register for Sengkang West B2 Industrial
Sengkang West B2 Industrial, also known as Sengkang Connection, brings 360 strata units in a ten-storey B2 building to Seletar West Road 3. Registered parties receive each release from the developer as it is issued, with first choice of viewing appointments.
Sent to registered parties first
- Preview dates, and a viewing appointment held for you once appointments open.
- The e-brochure, the floor plans and the price list, sent the day Soilbuild issues them.
- An estimate from the industrial purchase calculator, read beside the stamp duty and GST rules.
- Plain answers on industrial financing and the progressive payment stages.
Register for Sengkang West B2 Industrial
Each registration is answered personally by the Sales Concierge.
Prefer a call? Phone or WhatsApp the Sales Concierge on +65 6200 6220.